PVC Strip Curtain - DIY Installation Guide for Bolt-on, Soffit Fix System

The following instruction guide demonstrates how to get professional results from our made to measure Bolt-on, Soffit Fix - PVC strip curtain doors.

STEP 1 of 2

i/ Slide the M8 nuts into the centre slot and along the track

ii/ Place the brackets over the M8 nuts and tighten into position using the countersunk bolts

iii/ Place the brackets no more than 1200mm apart and no more than 200mm in from each end of the track

iv/ The "L" shapes brackets should be arranged so that each alternate bracket is facing the opposite side of the track

v/ Slide the required number of M8 bolts down both sides of the track ready to receive the curtain strips

Go to Step 2

Go to Step 2